{"id":1922,"date":"2020-09-08T09:25:00","date_gmt":"2020-09-08T07:25:00","guid":{"rendered":"https:\/\/cspspain.com\/csp-iberian-valencia-terminal-acquires-6-new-rtgs-from-konecranes\/"},"modified":"2025-12-15T09:29:07","modified_gmt":"2025-12-15T08:29:07","slug":"csp-iberian-valencia-terminal-acquires-6-new-rtgs-from-konecranes","status":"publish","type":"post","link":"https:\/\/cspspain.com\/en\/csp-iberian-valencia-terminal-acquires-6-new-rtgs-from-konecranes\/","title":{"rendered":"CSP Iberian Valencia Terminal acquires 6 new RTGs from Konecranes"},"content":{"rendered":"\n<figure class=\"wp-block-image aligncenter size-full has-custom-border\"><img decoding=\"async\" src=\"https:\/\/cspspain.com\/wp-content\/uploads\/2025\/12\/gbNxpWsLEGBNXE7kwFHJ.png\" alt=\"gbNxpWsLEGBNXE7kwFHJ\" class=\"wp-image-1390\" style=\"border-top-left-radius:16px;border-top-right-radius:16px;border-bottom-left-radius:16px;border-bottom-right-radius:16px\"\/><\/figure>\n\n<p>Valencia, September 7, 2020<\/p>\n\n<p>As CSP Spain announced last June, it has launched an investment plan for the Port of Valencia for the three-year period 2020-2023, with a projected expenditure of over \u20ac62 million. This renewed commitment to the Valencian port is aimed at increasing its competitiveness by improving the services and capacity of its facilities.  <\/p>\n\n<p>Within this investment plan that the company plans to undertake in the next 3 years, are the 6 RTGs that were unloaded last Monday and which will begin to be assembled immediately within the facilities of the CSP Spain Terminal in Valencia.<\/p>\n\n<p>The main objective of this new machinery addition is to improve service for terminal users. The terminal has a yard area of \u200b\u200b145 hectares, thanks to a 15-hectare expansion that became operational last December. <\/p>\n\n<p>The six new RTGs are wheeled overhead cranes with 135-ton structures. Their main features include a 41-ton lifting capacity, a lifting height of up to 18.1 meters (5+1 containers), a clearance between legs for six containers, and truck access. They are equipped with integrated Siemens controls by Konecranes.  <\/p>\n\n<p>These are <strong>state-of-the-art machines, with proven reliability and productivity,<\/strong> already present in the terminals of the Port of Valencia <\/p>\n\n<p>This is an<strong> environmentally friendly<\/strong> piece of equipment, mainly due to its efficient diesel engine with a fuel-saving system, the incorporation of electric mechanisms instead of traditional hydraulic ones, 100% LED lighting, and low maintenance needs.<\/p>\n\n<p>The equipment will enter service during the last quarter of this year as assembly operations are completed.<\/p>\n\n<p>Along with this addition of machinery, CSP Spain&#8217;s investment plan in Valencia includes the acquisition of 3 &#8220;MalaccaMax&#8221; cranes, which will arrive from the last quarter of 202, 8 new RTGs that will be added to the 6 already incorporated, the implementation of Navis4 as a new operating system and the purchase of more equipment for handling containers such as Reach stacker or Empty container Handler.<\/p>\n\n<p>This investment plan, together <strong>with the more than 100 million invested in the last 5 years, <\/strong>will allow the port to be more competitive at all levels and<strong> increase the operational capacity of the group&#8217;s terminal in Valencia by 30%<\/strong> to 5 million TEUs (currently it is approximately 2.5 million).<\/p>\n\n<p><strong>It is an investment intended to be a stimulus for the sector and an economic boost for the recovery after the impact of the Covid-19 crisis. <\/strong><\/p>\n\n<p>CSP Spain, present in Spain since 1973, belongs to the CSPL Group, the world&#8217;s largest port operator. This business group has more than 46 container terminals worldwide and handles over 90 million TEUs globally. <\/p>\n\n<p><a href=\"https:\/\/www.cspspain.com\/es\/noticia\/csp-spain-invertira-mas-de-62-millones-de-euros-en-el-puerto-de-valencia-hasta-2022\" target=\"_blank\" rel=\"noreferrer noopener\">More information about the investment plan<\/a><\/p>\n\n<div class=\"wp-block-group is-content-justification-center is-nowrap is-layout-flex wp-container-core-group-is-layout-23441af8 wp-block-group-is-layout-flex\" style=\"border-top-left-radius:16px;border-top-right-radius:16px;border-bottom-left-radius:16px;border-bottom-right-radius:16px\">\n<figure class=\"wp-block-image size-full has-custom-border\"><img decoding=\"async\" src=\"https:\/\/cspspain.com\/wp-content\/uploads\/2025\/12\/descarga-RTG&#xB4;S-puerto-de-Valencia.jpg\" alt=\"RTG unloading at the port of Valencia\" class=\"wp-image-1393\" style=\"border-top-left-radius:16px;border-bottom-left-radius:16px\"\/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-full has-custom-border\"><img decoding=\"async\" width=\"511\" height=\"768\" src=\"https:\/\/cspspain.com\/wp-content\/uploads\/2025\/12\/nueva-maquinaria-CSP-Spain.jpg\" alt=\"\" class=\"wp-image-1394\" style=\"border-top-right-radius:16px;border-bottom-right-radius:16px\" srcset=\"https:\/\/cspspain.com\/wp-content\/uploads\/2025\/12\/nueva-maquinaria-CSP-Spain.jpg 511w, https:\/\/cspspain.com\/wp-content\/uploads\/2025\/12\/nueva-maquinaria-CSP-Spain-200x300.jpg 200w\" sizes=\"(max-width: 511px) 100vw, 511px\" \/><\/figure>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Valencia, September 7, 2020 As CSP Spain announced last June, it has launched an investment plan for the Port of Valencia for the three-year period 2020-2023, with a projected expenditure of over \u20ac62 million. This renewed commitment to the Valencian port is aimed at increasing its competitiveness by improving the services and capacity of its [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1919,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"footnotes":""},"categories":[31],"tags":[],"class_list":["post-1922","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-csp-iberian-valencia-terminal"],"_links":{"self":[{"href":"https:\/\/cspspain.com\/en\/wp-json\/wp\/v2\/posts\/1922","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cspspain.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cspspain.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cspspain.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/cspspain.com\/en\/wp-json\/wp\/v2\/comments?post=1922"}],"version-history":[{"count":1,"href":"https:\/\/cspspain.com\/en\/wp-json\/wp\/v2\/posts\/1922\/revisions"}],"predecessor-version":[{"id":1923,"href":"https:\/\/cspspain.com\/en\/wp-json\/wp\/v2\/posts\/1922\/revisions\/1923"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/cspspain.com\/en\/wp-json\/wp\/v2\/media\/1919"}],"wp:attachment":[{"href":"https:\/\/cspspain.com\/en\/wp-json\/wp\/v2\/media?parent=1922"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cspspain.com\/en\/wp-json\/wp\/v2\/categories?post=1922"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cspspain.com\/en\/wp-json\/wp\/v2\/tags?post=1922"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}