
Last week at our Valencia terminal, a snail and seaweed-covered catamaran was unloaded into the water. It measured 17 meters long, 9 meters wide, and weighed 31 tons.
Thanks to the collaboration of the entire team involved, the maneuver was carried out optimally.
CSP Iberian Valencia Terminal has the necessary resources to carry out these types of operations. This is in addition to the necessary coordination of the departments and teams involved.






